Light Pole Installation Method Statement
E16 22 street light poles and arms e16 22 1 the contractor shall handle store and transport the poles and arms in a manner to prevent damage.
Light pole installation method statement. Ensure all finishing works in all related areas are completed for the area of installation and released cleared by civil section to proceed on with the installation of lighting fixtures. Type of lighting fixtures are to be selected as per the approved schedule of lighting and approved shop drawing. This information cannot be comprehensive enough to cover all situations or the details of all structures. Anchor bolts are the most commonly used method to secure poles to concrete foundations.
The contractor shall only use equipment rated for such weight. Material used will be as approved by the engineer the sizes and routes routing will be as per the approved shop drawing. Dismantle existing pole lantern and feeder pillar. Installation methods of external exterior and outdoor lighting system includes lighting equipment luminaires control gears panel boards poles brackets cabling and allied minor civil works.
Led street light pole installation procedure there are 6 in stallation procedures of led street lamp pole for your reference. This method statement will define the following works. Anchor bolts are specifically manufactured for pole foundations and each pole requires anchor bolts of an exact diameter and length. Installation guidelines 091015 1 installation guidelines for sports high mast lighting structures the following information is intended as a guide for the installing contractor.
Firstly we contact with the departments of the pipeline to understand the approximate distribution of underground cables and knowing the detailed division of underground pipelines through excavation channels. This guide covers the installation of light poles. Set up to be symmetrical about the pole axis to. All installations are to be carried out under strict supervision of qualified supervisors and engineers.
Pole assembly installation for street light poles figure 1. Power and lighting system for the whole building. If installation required heavy vehicles extreme care has to be taken for preventing damages of. Base for 25 35 pole is 680 kg.
By manual method prior to lowering the pole have one of the installation crew rotate the pole to match the position of the bolts and gently lower the pole maintaining alignment. 5 once the pole is lowered into place resting on the dumpy levelling nuts maintain the strain on the pole and using one of the spanners adjust the dumpy. A particular set up is shown in figure 1.